How Long Does Remodeling Take?

How Long Will My Remodel Take

When embarking on a home remodel, one of the most common questions homeowners ask is, “How long will my home remodel take?” The answer depends on several factors, including the municipality you’re in, the scope of your project, and your design and fixture selections. Let’s break down these considerations to give you a clearer picture of your remodel timeline.

Local Regulations and Inspection Points

The regulatory processes of your local building department play a significant role in the duration of your home remodel. Each state and municipality has different requirements for permits and inspections. For example, the number of inspection points required can greatly impact your project timeline. More inspections mean more scheduled visits from inspectors, which can add days or even weeks to your project.

Scope of the Project

The next major consideration is the scope of your remodel. Different areas of your home and the extent of the work required will determine the overall timeline. Here are some common remodel projects and their estimated durations:

  • Secondary bathrooms: 8-10 weeks
  • Primary bathrooms: 12-14 weeks
  • Primary suites including custom closets: 14-16 weeks
  • Kitchens including flooring: 12-16 weeks
  • Fireplaces: 3-4 weeks

These estimates are based on fully permitted custom work done by a reputable, licensed Design-Build firm.

Design and Fixture Selections

The design and fixture selections also play a prominent role in your remodel timeline. For instance, if your kitchen design includes cabinetry installed on top of countertops with a tile backsplash on the same wall, this sequence could add an additional two weeks to your timeline. The upper cabinets cannot be installed until the countertop is in place, and the tile backsplash typically goes up after the cabinets.

On the flip side, certain design decisions and finish materials can expedite the installation process. For example, purchasing stock vanities that come with a countertop from a retailer like Anthropologie can save you 5-10 business days, as you eliminate the need for a local countertop fabricator to template and create a custom countertop.

Leveraging Experience and Historical Data

At KBF Design Gallery, with over 20 years of experience in the industry, we can draw on historical data from our completed projects to provide more accurate timelines. We primarily specialize in bespoke, high-end projects, so our timelines reflect that level of customization and detail. If your project is more straightforward or doesn’t incorporate many custom elements, you might be able to shave a couple of weeks off our averages.

Conclusion

Ultimately, the duration of your home remodel depends on several factors: local regulations, the scope of your project, and your design choices. By understanding these elements and communicating your priorities to your designer and contractor, you can better manage your expectations and plan your project effectively. If you prioritize installation time, be sure to make that clear from the start, as there are many ways to streamline the process without compromising on quality.

At KBF Design Gallery, we are committed to delivering exceptional results within a reasonable timeframe, ensuring your remodel experience is as smooth and efficient as possible.